Inhibition of the plasma cell dark current has made great progress New energy standards for urgent introduction of passenger car battery recycling
Jan 24

Recently, the new energy economy meter input and discharge of the battery terminal on the monitoring line, after five days of intense installation, commissioning, bps10,vgp-bpl2, vgp-bps2  testing success with success in the THT office in Qiqihar Northeast Power Grid Corporation of production applications. This project is the full install so that the battery power in the grid, no heat, which can effectively extract energy, saving resources, and avoid the work of the next discharge of thermal radiation and high fire hazards, but also save considerable resources of power.

The typical approach is to discharge the two ends of the battery connected to a group of electric heating, through the resistance will be converted into thermal energy into electrical energy Out, while at least two staff members as group, the hour meter record with a single cell voltage, manual recording of data, the results of computer input data, generate reports, such as a discharge to staff to increase the load, will generate considerable radiant heat. gd761, td347 

New battery terminal on-line monitoring system is the discharge of the battery monitoring software monitoring device can monitor the battery voltage single, automatically generating data reports; Feedback instrument energy discharge is 220 volts DC power for the batteries discharge and the design and manufacture of high technology products. It uses the technology of power electronics, the use of the inverter active approach will be able to transform DC battery released for exchange in the network, the process of intelligent control of discharges, with the use of safe, convenient, high degree of automation, high savings of energy efficiency, remote monitoring can be characteristic.pa3465u-1brs , pa3480u-1brs

Comments are closed.